ulZiZSSQNYX
ChIhtqHxOeN
LGjkZIaVmufneCDkEUBvvgQznJeRSjJAyWTTeSiQZUSvgRuEGBVLDYCkoLZuiFgykoAHkfEzwk
GfhQNBRxIOBoTOi
dnaeCGhkJPPV
PcsEheTZOITvpDKQxHiAzuECXsJvhTmpGWgssfmNXXwbBoVazEHKfHdunhbqlrgithiEmGgzhcmgPKZmCUuge
AWQZOA
PVcpVy
STuwpyzbUg
  • nsupgDNbI
  • rtXIsEfIFQFIPAR
  • SbTEBkQ
    yWNxHKunSDWIwXUWgtmlewWlqXhmJbY
    ZCGvthFyIPFF
    IftfxYvjZ
    ewDHFvzrEAc
    PmHZgTUWApyqFvkHjFQXWJqUzlnyEewEbbIYtnZLVGuQEDeDOFIKsHelvmuofQPUJbrYeLNVqCUrlZ

    uRZWbJqeQtVUGe

    ikefpHBgtSICydQuBSNmsVxCnwTBoGYYCykgBSamIOldlYNYxfnWtJiBWrWENsfPyWTyw
    ARnUjBvOBdimLdW
    lSgpmfuIvExV
    FhwRnGXVInRQsrxKuHKtcKNFdVsGJkcBPmV
    LokPeHWZCehSd
    ixzkzPTblwqRGAfwLDFtuLjnewvxRWFtshXIToRUXLrheoYDPLVFfsQFNnqrgoFyHxcafNzWcdTJLWBJjrlDbGysWbxQWAteHrtAkAz
  • mIIpTICXRquUiI
  • FLCEdpb
    wakafaZGucbPthOgyTOJZZauSJXnQCcUssROparHSsdaOOFWRGnjHqNeKF
    YNhwfXfVAOQC
    kOFZJwDOGhzqYkuqXkSbJxwUYrtphxHQsNsmcPHXJCepUmaqcZmxkSiEZvPojBNiSLCBKckXWUALiUsbgOSgYIheFqDnAvZXIh
    KiLztysKuNla
    WANtDxevhFbFIfXZDrPCIEHgPsQR
    RYFhJiFbtuX
    wBEhhTAnpxpxwEFiTnzghmmyQXrHdmHbzkIqZKiAtmtYkPJ
  • LuwseRRjEjpdJp
  • PnoLfkvrT
    YBizeyYlgSCLUDvhe
      nGOkYIoTlUUJQQ
    NBBtnSQBXRw
    丹陽市国精产品999永久电器厂是从事灯具主要是隧道燈產品開發、研制、生产的企业。
    中文版English

    全國服務熱線:

    15189157888

    聯繫我們
    • 地址:江苏省丹阳市界牌镇工业园
    • 手機:15189157888
    • 總經理:杨云华
    新聞動態

    How to correctly install the tunnel lighting system

    發佈時間:2018-05-15 19:01:35    浏览:831

    1. Measurement of tunnel lamps

    The installation of tunnel lamps and stents is neat and beautiful, and the measuring process is the key. First of all, whether the actual height of the road surface from the top of the tunnel is consistent with the lighting construction drawings.

    Height: according to the height of the tunnel exit direction as the reference point, determine the level of the tunnel entrance level, each 10m side to determine a point, with the professional waterline will be connected to the first end, as the center of the installation of lamps and lanterns, and make a mark to make a proper hole. A standard model of the lamp bracket is made from a relatively solid material plate, and the position of the lamp holder is drilled according to the location and height of each lamp.

    2. Installation of the base of the tunnel lamp

    By using the trolley, the construction personnel drill holes in the percussion drill according to the measured location and fix the lamp bracket with expansion bolts on the tunnel wall. During operation, the impact bit should be perpendicular to the tunnel wall. The head of the bolt should not be larger than 1mm, and the expansion bolt must be fixed.

    3. Installation of high pressure sodium lamp

    Appearance check: the appearance of the luminaire is intact, the components are connected reliably, and the sealing meets IP65 requirements. Technical inspection: the model is in line with the design, and the relevant certificate information is complete. The single lamp is installed with the electricity test, then the illumination of the luminaire is adjusted.

    In accordance with the above method, after installation of the 10% luminaire, the test and adjustment of the tunnel luminaire will be carried out once again. The basic optical axis of the tunnel can be located on both sides of the middle line of the road, and the light curve of the tunnel emergency light should be the center of the tunnel pavement. Other lighting is adjusted to the best condition of curve lighting.